Bigelow Builders Inc. · California CSLB #1163950 · B – General Building

Plumbing / Orange County

Water, drains and gas
routed before the walls close.

Plumbing decisions are made early and are expensive to change late. Bigelow Builds plans plumbing coordination within eligible multi-trade ADU, addition and remodeling projects, including required permits and inspections.

Scope comes first
This trade is considered within eligible multi-trade residential projects. A standalone specialty request needs a separate licensing and contractor review before any quote or commitment; availability is not promised.

What this scope
can include.

Every project gets a written scope that states what is included and what is not. These are the kinds of work this service covers.

01

ADU and addition plumbing

Water supply, drain, waste and vent rough-in, and fixture finish for kitchens, baths and laundry.

02

Sewer and water connections

Tying a new unit into the existing sewer lateral and water service, or planning separate connections where required.

03

Water heating and gas

Tank, tankless or heat pump water heating and gas line planning for ranges, dryers and heaters.

04

Remodel and repair scopes

Relocating fixtures, replacing failed lines and correcting drainage or venting problems.

Projects that
start here.

If one of these sounds like your project, the inquiry form is the right next step. If none do, describe your situation and we will tell you whether it fits.

Discuss a plumbing project

What to settle
before work starts.

These are the questions that shape the scope, the schedule and the price for this kind of work.

Underground work first

Sewer, water and gas lines under a slab or through the yard are placed and inspected before the foundation and framing. Routing is decided at the planning stage.

Fixture locations

Rough-in follows the plans and the actual fixtures. Final fixture selections, sink and appliance specs are needed before the walls close.

Inspections

Underground, rough and finish plumbing each have inspection checkpoints that are built into the schedule.

Water heating and gas

Fuel type, water heater location, venting and gas demand shape the layout. These are decided before rough-in.

How the work
is organized.

The written scope establishes how this stage fits the eligible project, who performs each part and which inspections are required.

01

Map the connections

We review the plans, fixture locations and the existing sewer, water and gas services.

02

Define the plumbing scope

A written scope covers underground, rough-in, finish, fixtures, water heating, permits and inspection responsibility.

03

Underground and rough-in

Lines are installed, pressure tested and inspected before they are covered.

04

Finish and verify

Fixtures, valves and appliances are connected and tested, and the final inspection closes the stage.

In a full ADU build, underground plumbing precedes the foundation, rough-in follows framing, and fixture finish happens near the end.

Useful answers
about plumbing.

Plumbing across
Orange County.

Newport Beach · Irvine · Costa Mesa · Mission Viejo · Laguna Niguel · Los Angeles · Long Beach · Torrance · Surrounding communities

Tell us your property city. Projects elsewhere in Southern California are considered individually.

Tell us about
the plumbing work.

Share the property city, what the project involves and where the plans stand. The service is preselected for this page.

(949) 342-6434Bigelow Builds · Business line
Before construction begins

California CSLB #1163950. Scope, pricing and start dates are confirmed in a written agreement.

Plumbing, at a glance.

Tell us where you are in the process. Fields without an optional label are required.

Budget ranges help us understand the scope. They are not price estimates or financing offers.

Loading the inquiry form. You can also call (949) 342-6434.

By submitting, you ask Bigelow Builds to contact you about this inquiry. This does not enroll you in marketing. How your information is handled.

Call Bigelow BuildsYour project