ADU and addition electrical
Circuit planning, rough-in, device and fixture installation and finish for new living space.

Electrical / Orange County
Electrical work runs through an ADU, addition or major remodel. Bigelow Builds plans electrical coordination within eligible multi-trade residential projects, from rough-in to finish and required inspections.
Scope comes first
This trade is considered within eligible multi-trade residential projects. A standalone specialty request needs a separate licensing and contractor review before any quote or commitment; availability is not promised.
01 / Scope
Every project gets a written scope that states what is included and what is not. These are the kinds of work this service covers.
Circuit planning, rough-in, device and fixture installation and finish for new living space.
Evaluating whether existing service and panel capacity support the new load, and planning the right path if they do not.
Lighting layouts, switching, outlets, dedicated circuits for kitchens, laundry and equipment.
Correcting problem circuits, adding capacity for appliances or workspaces, and preparing for future needs.
02 / Common situations
If one of these sounds like your project, the inquiry form is the right next step. If none do, describe your situation and we will tell you whether it fits.
Discuss an electrical project03 / Planning considerations
These are the questions that shape the scope, the schedule and the price for this kind of work.
New living space adds load. The existing service, panel and feeder sizes determine whether the project can connect directly or needs an upgrade.
Rough electrical is inspected before walls are closed, and the finish is inspected at the end. These checkpoints are built into the schedule.
Whether an ADU shares the main meter or has its own depends on the city, the utility and how the unit will be used. This is settled early.
Electrical rough-in has to fit around framing and plumbing. Fixture locations, cabinetry and appliance specs need to be known before rough-in.
04 / Process
The written scope establishes how this stage fits the eligible project, who performs each part and which inspections are required.
We review the plans, the intended use, appliance and equipment needs and the existing service.
A written scope covers circuits, devices, lighting, panel work, permits and inspection responsibility.
Boxes, wiring and panel work are installed and inspected before drywall.
Devices, fixtures and covers are installed, circuits are tested and the final inspection closes the stage.
05 / Related work
In a full ADU build, electrical rough-in happens after framing and before insulation, and the finish stage follows painting.
06 / Questions
Orange County and Los Angeles, California
Newport Beach · Irvine · Costa Mesa · Mission Viejo · Laguna Niguel · Los Angeles · Long Beach · Torrance · Surrounding communities
Tell us your property city. Projects elsewhere in Southern California are considered individually.07 / Your project
Share the property city, what the project involves and where the plans stand. The service is preselected for this page.
(949) 342-6434Bigelow Builds · Business lineCalifornia CSLB #1163950. Scope, pricing and start dates are confirmed in a written agreement.